Skip to main content
AVOID.NET

Zero Network (Zerion L2)

avoid.net/zero-network-zerion-l2→28/100·78% conf.
[AI-DRAFTED · AWAITING VERIFICATION]

Auto-generated score, not yet verified against the scoring model. Under review — treat as indicative, not a verdict.

anchored·3Euneg…SR1c

Summary

Zero Network was an Ethereum Layer 2 rollup launched in November 2024 by Zerion, a crypto wallet company, offering gas-free transactions via a ZK Stack architecture deployed through Caldera's rollup-as-a-service platform. After experiencing a 26-day block production outage in December 2025 and failing to achieve meaningful adoption, Zerion announced on May 21, 2026 that Zero Network would permanently cease operations by July 31, 2026, requiring all users to bridge their assets off-chain before that deadline. Approximately $670,000 in total value was secured on-chain at the time of the L2Beat measurement, and no post-deadline recovery mechanism has been publicly disclosed.

Connected Entities

7 entities · 60 linked investigations
Relationships
  • Syndicate Labs (SYND)→mentioned with→Ethereum(80%)
  • Syndicate Labs (SYND)→mentioned with→Arbitrum(70%)
  • Optimism→mentioned with→Arbitrum(65%)
  • Optimism→mentioned with→Ethereum(80%)
  • ZKsync→mentioned with→Ethereum(80%)
  • Zerion Wallet→mentioned with→Syndicate Labs (SYND)(80%)
  • Zero Network (Zerion L2)→mentioned with→Syndicate Labs (SYND)(80%)
  • Zerion Wallet→mentioned with→Zero Network (Zerion L2)(80%)
  • Zero Network (Zerion L2)→mentioned with→Zerion Wallet(80%)
  • Zerion Wallet→mentioned with→Ethereum(80%)
  • + 6 more
Have evidence about Zero Network (Zerion L2)?
0
Accepted
1
Under review
0
Rejected / revoked

Community submissions

  • Under reviewincriminating[WAYBACK]7/2/2026, 4:09:29 PM

    “Zerion is shutting down its Zero Network Ethereum Layer 2 by July 31, 2026, after 18 months of operation. Deposits are already disabled. Funds locked in DeFi contracts, LP positions, or multisig wallets on the network cannot be auto-migrated and may become permanently inaccessible after the sequencer cutoff for users who missed the announcement.”

    — avoid-scout

Timeline(8 events)

15 March 2024

Zerion publicly announces plans to build a zero-fee Layer 2 network built on ZK Stack technology

CryptoTimes

July 2024

Zerion deploys testnet for the Layer 2 rollup built on ZK Stack, in collaboration with Caldera

The Block

12 November 2024

Zero Network launches on Ethereum mainnet as the first production-ready ZK Stack rollup on Caldera's platform, offering gas-free transactions through a paymaster model

Caldera blog / The Block

19 December 2025

Zero Network block production halts entirely; a state update gap begins that will last approximately 26 days

KuCoin / L2Beat

8 January 2026

Zerion publicly acknowledges the block production outage, states it is working with Caldera and ZKsync to resume operations by mid-January 2026

KuCoin

15 January 2026

Block production on Zero Network resumes after the approximately 26-day outage

L2Beat / KuCoin

21 May 2026

Zerion announces permanent shutdown of Zero Network via X, citing strategic pivot to wallet and API products; inbound bridging is disabled immediately; users given until July 31, 2026 to withdraw all assets

CryptoTimes / The Block / BanklessTimes

31 July 2026

Zero Network withdrawal deadline: block production ceases entirely; assets not bridged out by this date are at risk of permanent loss

CryptoTimes / Cryptonomist / The Block
Provenance & Audit Trail

Decision Log

This investigation is cryptographically anchored to the Solana blockchain (3 events). 12 of 17 cited source URLs have an Internet Archive snapshot.

model: claude-sonnet-4-6

generated: 7/2/2026, 12:13:11 PM

last updated: 8/25/2026, 10:28:42 PM

9 views

avoid.net — verified advice for a post-truth world