Fact-check findings
What an automated fact-checker found when it re-read Mars Perps against the sources the page cites. Only the most recent review is shown.
These findings are produced by an automated reviewer, and its results vary between runs: the same page, checked three times on the same day, came back with 15%, 20% and 34% of its claims disputed, mostly because each run extracted a different number of claims. Treat what follows as leads, not rulings.
“Disputed” means the reviewer could not reconcile the claim with the evidence it cited. It does not mean the claim is false. “Unverifiable” means no reachable source settled it either way.
Nothing here changes the page on its own. A proposed correction is applied only after a human moderator approves it; until then the page reads as it did when reviewed.
disputed
1 claimThe reviewer could not reconcile the claim with the evidence it cited. This is a lead, not a ruling that the claim is false.
- #5[disputed][awaiting moderator]in the timeline
“Neutron outpost on Osmosis confirmed unaffected.”
reviewerNeutron outpost on Osmosis confirmed unaffectedInternal contradiction: section 0 says the Osmosis outpost is a separate Mars Protocol outpost, while Neutron is a different chain. A Neutron outpost cannot be on Osmosis. Correction rests on the page's own section 0 text, not a fetched external source.Proposed correction (not yet applied)Mars outpost on Osmosis confirmed unaffected.
unverifiable
4 claimsNo source the reviewer could reach confirms or contradicts the claim.
- #2[unverifiable][awaiting moderator]in section: December 2025 Security Exploit
“Approximately $960,000 in bad debt was recorded, isolated to the USDC lending market on the Neutron outpost.”
reviewerApproximately $960,000 in bad debt was recorded on the USDC marketRange article states no bad-debt number. The Mars forum post that likely carries it was unreachable. - #6[unverifiable][awaiting moderator]in section: Remediation and Compensation
“Based on estimates at the time of the remediation plan, 96.48% of affected users were projected to receive full reimbursement once the combined Mars and Neutron distributions were applied.”
reviewerRemediation portal launched Jan 28, 2026 with window through Feb 27, 2026; Neutron contributed about 100,600 USDC; 96.48% of users fully reimbursedPrimary forum source could not be read, and X posts are not fetchable. Says nothing about the claim. - #10[unverifiable][awaiting moderator]in section: Security Audit History
“Halborn conducted a security assessment beginning February 14, 2022 and ending February 18, 2022, covering the mars-council, mars-red-bank, and mars-vesting contracts.”
reviewerHalborn assessment Feb 14-18, 2022 of mars-council, mars-red-bank and mars-vesting; Oak Security auditsNot fetched within this review's limits; no contradicting evidence seen. - #11[unverifiable][awaiting moderator]in section: Terra Collapse Exposure
“At its peak on the Terra blockchain, Mars Protocol reported approximately $350 million in total value locked, representing roughly 1.8% of Terra's total TVL of $18.74 billion.”
reviewerPeak Terra TVL about $350 million, 1.8% of Terra's $18.74 billion; combined $1.2 billion TVL decline across Mars and AstroportNot checked. Note the cited Cointelegraph URL is flagged not-found in archive data, and the timeline attributes a 2022-03 peak to launch, which is doubtful because the $350M peak followed launch. Treat with caution.
partially supported
3 claimsThe cited evidence supports part of the claim but not all of it.
- #4[partially supported][awaiting moderator]in the timeline
“Attacker begins pre-staging operation via Tornado Cash, making seven ETH deposits approximately one month before the exploit.”
reviewerTimeline pins pre-staging start at 2025-11-14Source supports only 'about a month before'. The exact date 2025-11-14 is not backed by the fetched source and the entry has no source. - #8[partially supported][awaiting moderator]in the timeline
“Mars Protocol Foundation ceases operations. Discord and Telegram channels closed. Protocol wind-down confirmed complete; all user funds returned to wallets.”
reviewerFoundation ceased operations Mar 23, Discord and Telegram channels were closed, and wind-down confirmed complete on 2026-03-23Search reporting puts the completion announcement near March 31, with channels still 'to be closed'; March 23 appears to be the Foundation's stated operating horizon. Based on search snippets since page bodies were not readable, so confidence is moderate. - #9[partially supported][awaiting moderator]in section: Protocol Wind-Down and Shutdown
“Mars Protocol's official Discord and Telegram channels were subsequently closed, and no further support or updates have been provided.”
reviewerChannels closed and no support provided; wind-down concluded in March 2026 with user funds returnedSource supports the announcement of closure, not that closure occurred. Same snippet-based caveat.
confirmed
3 claimsThe cited evidence supports the claim as written.
- #1[confirmed][no action needed]in section: December 2025 Security Exploit
“The attacker looped this pattern 15 times using an initial $49,783.92 USDC to extract approximately $973,000, a return of roughly 19.5x on capital deployed.”
reviewerExploit on Dec 14, 2025 extracted $973,079 USDC with 15 loops from about $49,783 initial capital; attacker and contract addresses as listedRange matches date, amounts, loop count and addresses. The 19.5x ratio is arithmetic consistent with the figures. - #3[confirmed][no action needed]in section: Fund Flow and Attribution
“Pre-attack funding for the operation was staged via Tornado Cash: the attacker made ten ETH deposits totaling 16.22 ETH, with seven of these deposits occurring approximately one month before the exploit, indicating the attack was premeditated and prepared over a significant period.”
reviewerFund flow: five hops via Noble, CCTP, Base wallets to Binance hot wallet; Tornado Cash ten deposits totalling 16.22 ETH, seven about a month earlierMatches. Minor: Range lists the Base wallet 0xFF88 as the Tornado-funded wallet; the page says 'the attacker'. - #7[confirmed][no action needed]in section: Protocol Wind-Down and Shutdown
“Governance proposal MRC-165, which put the structured wind-down to a community vote, was approved following a 5-day forum discussion and a 3-day on-chain vote, with execution commencing on February 24, 2026.”
reviewerMRC-165 vote Feb 21-24, 2026; execution from Feb 24; LTVs fall about 3% per day; LTVs set to 0 by about March 21Vote window, execution date and LTV schedule match. The 5-day forum discussion and approval outcome were not independently checked in this source.